fast cure, styrene free polyester chemical anchor, suitable for air conditioner, stairs, home appliance.
10:1 300ml 410ml Cartridge Polyester Injection Anchoring Adhesive
10:1 Polyester Chemical Anchor Adhesive
Chemical anchor adhesive, polyester injection mortar, Chemical fixing glue,
Chemical anchoring system used for anchoring and rebar connections in concrete.
Item #: FixingChor230/241
Capacity: 300ml /410ml
Materials: Polyester
Mixing Ratio: 10:1
Description
A two-component, high strength polyester adhesive anchoring system. The system includes injection adhesive in plastic cartridges, mixing nozzles, dispensing tools and hole cleaning equipment. is designed for bonding threaded rod and reinforcing bar hardware into drilled holes in concrete base and solid masonry materials.
Xinchor FixingChor230/241 Polyester Injection Mortar is ideal for
· accessories and connecting rods;
· concrete, hollow or filled bricks in anchors and repairs.
· in the planting of metal sprouts,
· in prefabricated member anchors,
· Fixing of injection pakers and apparatus.
· in anchors of bolts and pins,
· central heating and ventilation ete. installation of pipes and fittings
Features and Benefits
· it hardens very quickly and gains mechanical strength very quickly.
· lts application is easy, it saves time.
· it is pasty; sagging, overhead applications can be used easily.
· protect equipment against corrosion.
· it has high resistance against chemical substances.
Application Notes / Restrictions
· Do not use the first mixture out of the gun.
· Use anchoring anchors (bricks or blocks) to fix anchoring material to hollow material
· Open the cap by turning and remove it, insert a static mixer. Place the cartridge in the gun and start applying. When the application is interrupted, the static mixer may be left on the cartridge after the pressure in the gun has been drained.
· lf the resin has hardened in the static mixer, a new mixer must be fitted before starting work.
· When storing an opened cartridge, remove the static mixer by rotating it, clean the cartridge mouth with a clean, dry cloth, and close the lid.
· Contains styrene.
· Keep away from childrens reach.
· Do not breathe. Use in a well-ventilated area.
· The product may irritate skin. Work clothes, protective gloves, masks and glasses must be used. Protective cream can be applied to hands before starting work. in case of grout contact with eyes, eyes should be washed immediately with warm water and consult a doctor.
· Parts contacted with skin and hand must be washed with water and soap. in case of contact with eyes, consult a doctor.
Technical Parameter:
1. Basic parameters
1) Appearence: Grey (mixed)
2) Mixing ratio (Volume ratio): 10:1
3) Density: 1.71kgs/m2
4) Compress strength: 46 N/mm²
5) Shelf time: 12 months
2 Main Performance
Pot Life |
7-10 mins (20℃) |
Full Curing |
7 days |
Cleaning Time |
45 mins (20℃) |
Service Temperature |
0°c to +80°C |
Adherence (concrete surface, 7days) |
≥4 N/mm2 ( |
Bending Strength (7 days) |
18-20 N/mm2 |
Tensile Load Impact Creep |
≤0.6 mm (after 3 months under 50 kN load |
Technical data are approximate values obtained from the laboratory study of Tekno Construction Chemicals for finished products obtained at +20°C air temperature and 50% relative air humidity. |
Processing Method
1 Tools
· Electric hammer
· Hole cleaning brush
· Air compressor
· Glue gun
2 Attention
· Drill as per requested hole dia. and depth
· Clean the hole completely
· Inject from the bottom of the hole and pull out the gun slowly.
· After planting the bar, let the gel harden in still.
3. Processing Flow
Drilling: As per technical data
Cleaning: using pump or compressed air and brush to clean the hole completely.
Assembling and Injection: Mount the static mixer onto the bottle, push out some incomplete mixed gel at the front part,then inject from the bottom of the hole, to fill 1/2 to 2/3 depth of the hole.
Bar planting: spin slowly the bar or screw into the hole, adjust up and down for several times to make the gel average, but don’t touch it during hardening time.
Curing and Maintenance: According to the temperature of the base materials, give enough time to harden and start to load mounting until it hardened completely.
Curing time:
Temperarure ℃ |
5 |
15 |
25 |
≥30 |
Operation time (min) |
20 |
10 |
6 |
4 |
Harden time (min) |
90 |
60 |
35 |
25 |
Packaging:
1. One cartridge with one mixer
2. 20pcs/30pcs per carton.
3. Xinchor label or your own label.
4. EXP Date on the top of cartridge.
5. Customized Packing.